Xlite is low density concrete as low as 800 – 1800 Kg/cu.m. It enhances thermal insulation and effectively replaces brickbat coba, concrete screed, protection screed thereby reducing dead load on existing structures
Reduces dead load on existing structures largely, helps optimize design Cost
Better thermal & sound insulating capability vs standard concrete & brickbat coba (low thermal conductance)
Ease of Placement – much faster & time saving solution, surface is ready to use within 24 hrs
Easily pumpable to necessary horizontal & vertical distances (> 40 m) Exceptionally low densities are obtainable – upto 600 kg/m3
More consistent, better alternative to “Foam concrete”
Easy to repair & maintain
Very low risk of shrinkage cracks
Reduces dead load on existing structures largely, helps optimize design Cost
Better thermal & sound insulating capability vs standard concrete & brickbat coba (low thermal conductance)
Ease of Placement – much faster & time saving solution, surface is ready to use within 24 hrs
Easily pumpable to necessary horizontal & vertical distances (> 40 m)
Exceptionally low densities are obtainable – upto 600 kg/m3
More consistent, better alternative to “Foam concrete”
Easy to repair & maintain
Very low risk of shrinkage cracks
Density (kg/m) | 800 to 1800 |
Compressive Strength (28 days), Mpa | 2-6 |
Slump | 300 - 400 +mm |
Water Absorption | 5-10% |
Thermal Conductance (W/m k) | 0.17 to 0.54 |
N.B : Mix design can be customized as per customer’s requirement.
Timelines depend on the project size and scope. Small renovations may take weeks, while larger builds can span months to years.
Research contractors by checking references, licenses, insurance, and past projects. Obtain multiple quotes and compare.
Costs vary widely based on size, materials, labor, and location. Get detailed estimates from contractors.
A contingency budget is an additional reserve (usually 10-20% of the total cost) for unexpected expenses.
This depends on your goals, location, and budget. For example, wood is great for aesthetics, while steel is strong and durable.
Yes, but changes may increase costs and delay the timeline. It’s best to finalize designs before work begins.
WhatsApp us