Alexa offers Lente to take control, postpone the setting of concrete at any time on your project or structure.
High cement concretes that set very rapidly
For any long haul requirements
When you expect site delay-construction site requiring concrete > 3 hrs transportation time due to distance or congested traffic conditions. RCC Columns
Patterned or stamped concrete
Tunnels
Chimney
Longer retention for 4 to 6 hours – can be poured without further agitation
Reduces risk of costly repairs
Reduces the risk of site personnel demanding the addition of water
Has no adverse effect on properties of hardened concrete
Density | 2300 to 2600 + 50 Kg/m |
Compressive Strength (28 days) | 20 to 40+ N/mm |
Slump | 80 to 130+ mm |
intial Setting Time | 4 to 6 hrs |
N.B : Mix design can be customized as per customer’s requirement.
Timelines depend on the project size and scope. Small renovations may take weeks, while larger builds can span months to years.
Research contractors by checking references, licenses, insurance, and past projects. Obtain multiple quotes and compare.
Costs vary widely based on size, materials, labor, and location. Get detailed estimates from contractors.
A contingency budget is an additional reserve (usually 10-20% of the total cost) for unexpected expenses.
This depends on your goals, location, and budget. For example, wood is great for aesthetics, while steel is strong and durable.
Yes, but changes may increase costs and delay the timeline. It’s best to finalize designs before work begins.
Lente effectively slows down cement hydration process and has no adverse effect on performance of concrete.
Give more time to crew for placing concrete
.
Directly reduce risk in adverse situations